Contract NumberContract Number Contract NumberE5125
Contract DescriptionContract Description Contract DescriptionICT Capital Asset Replacement Program - Multi function Devices
ContractorContractor ContractorKyocera Document Solutions Australia Pty Ltd
Address of ContractorAddress of Contractor Address of ContractorPO Box 525
Contractor SuburbContractor Suburb Contractor SuburbNorth Ryde NSW
Contractor PostcodeContractor Postcode Contractor Postcode1670
Related CompaniesRelated Companies Related CompaniesNA
Start DateStart Date Start Date29-May-2018
End DateEnd Date End Date29-May-2023
Contract amount( incl. GST)Contract amount( incl. GST) Contract amount( incl. GST)$876,132.75
Description of provision where amount can be variedDescription of provision where amount can be varied Description of provision where amount can be variedNA
Provisions for RenegotiationProvisions for Renegotiation Provisions for RenegotiationNA
Method of TenderingMethod of Tendering Method of TenderingState Contract
Provision for Operational or Maintenance ServicesProvision for Operational or Maintenance Services Provision for Operational or Maintenance ServicesNot Applicable
Particulars of Future Transfer of Significant Assets to the State at Zero CostParticulars of Future Transfer of Significant Assets to the State at Zero Cost Particulars of Future Transfer of Significant Assets to the State at Zero CostNA
Particulars of Future Transfer of Significant Assets to the Contractor including proposed transfer dateParticulars of Future Transfer of Significant Assets to the Contractor including proposed transfer date Particulars of Future Transfer of Significant Assets to the Contractor including proposed transfer dateNA
Results of Any Cost Benefit AnalysisResults of Any Cost Benefit Analysis Results of Any Cost Benefit AnalysisNA
A Summary of Information Used in the Full Base Case Financial ModelA Summary of Information Used in the Full Base Case Financial Model A Summary of Information Used in the Full Base Case Financial ModelNA
Particulars of How Risk Will Be Apportioned Between Parties if RelevantParticulars of How Risk Will Be Apportioned Between Parties if Relevant Particulars of How Risk Will Be Apportioned Between Parties if RelevantNA
Component and Quantum of Public Sector Comparator if usedComponent and Quantum of Public Sector Comparator if used Component and Quantum of Public Sector Comparator if usedNA
Particulars of Any Significant Guarantees or Undertakings Between the PartiesParticulars of Any Significant Guarantees or Undertakings Between the Parties Particulars of Any Significant Guarantees or Undertakings Between the PartiesNA
Particulars of Project / Goods / Services Provided, or Real Property to be Leased or Transferred Under ContractParticulars of Project / Goods / Services Provided, or Real Property to be Leased or Transferred Under Contract Particulars of Project / Goods / Services Provided, or Real Property to be Leased or Transferred Under ContractICT Capital Asset Replacement Program - Multifunction Devices
Any Other Key Elements of the ContractAny Other Key Elements of the Contract Any Other Key Elements of the ContractNA
Evaluation CriteriaEvaluation Criteria Evaluation CriteriaNA
Contract NumberContract Number Contract NumberT19/04
Contract DescriptionContract Description Contract DescriptionSupply and Install Wisemans Park Sports Field Lighting
ContractorContractor ContractorCentral West Electrical Contractors Pty Ltd
Address of ContractorAddress of Contractor Address of ContractorUnit 3/229 Russell St
Contractor SuburbContractor Suburb Contractor SuburbBathurst NSW,
Contractor PostcodeContractor Postcode Contractor Postcode2795
Related CompaniesRelated Companies Related CompaniesNA
Start DateStart Date Start Date16-Sep-2019
End DateEnd Date End Date16-Sep-2022
Contract amount( incl. GST)Contract amount( incl. GST) Contract amount( incl. GST)$342,560.90
Description of provision where amount can be variedDescription of provision where amount can be varied Description of provision where amount can be variedNA
Provisions for RenegotiationProvisions for Renegotiation Provisions for RenegotiationNo
Method of TenderingMethod of Tendering Method of TenderingNegotiated Contract
Provision for Operational or Maintenance ServicesProvision for Operational or Maintenance Services Provision for Operational or Maintenance ServicesNot Applicable
Particulars of Future Transfer of Significant Assets to the State at Zero CostParticulars of Future Transfer of Significant Assets to the State at Zero Cost Particulars of Future Transfer of Significant Assets to the State at Zero CostNA
Particulars of Future Transfer of Significant Assets to the Contractor including proposed transfer dateParticulars of Future Transfer of Significant Assets to the Contractor including proposed transfer date Particulars of Future Transfer of Significant Assets to the Contractor including proposed transfer dateNA
Results of Any Cost Benefit AnalysisResults of Any Cost Benefit Analysis Results of Any Cost Benefit AnalysisNA
A Summary of Information Used in the Full Base Case Financial ModelA Summary of Information Used in the Full Base Case Financial Model A Summary of Information Used in the Full Base Case Financial ModelNA
Particulars of How Risk Will Be Apportioned Between Parties if RelevantParticulars of How Risk Will Be Apportioned Between Parties if Relevant Particulars of How Risk Will Be Apportioned Between Parties if RelevantNA
Component and Quantum of Public Sector Comparator if usedComponent and Quantum of Public Sector Comparator if used Component and Quantum of Public Sector Comparator if usedNA
Particulars of Any Significant Guarantees or Undertakings Between the PartiesParticulars of Any Significant Guarantees or Undertakings Between the Parties Particulars of Any Significant Guarantees or Undertakings Between the PartiesNA
Particulars of Project / Goods / Services Provided, or Real Property to be Leased or Transferred Under ContractParticulars of Project / Goods / Services Provided, or Real Property to be Leased or Transferred Under Contract Particulars of Project / Goods / Services Provided, or Real Property to be Leased or Transferred Under ContractSupply and Install Wisemans Park Sports Field Lighting
Any Other Key Elements of the ContractAny Other Key Elements of the Contract Any Other Key Elements of the ContractNA
Evaluation CriteriaEvaluation Criteria Evaluation CriteriaCost to Council
Evaluation CriteriaAppreciation of scope of works and construction methodology
Evaluation CriteriaPrior Experience
Evaluation CriteriaStaff qualifications and experience
Evaluation CriteriaProposed sub-contractors
Evaluation CriteriaDelivery Program
Evaluation CriteriaStrengthening Local Ecconomic Capacity
Evaluation CriteriaEnvironmental and WHS
Contract NumberContract Number Contract NumberTE1361
Contract DescriptionContract Description Contract DescriptionKembla Terraces - Units 6 & 7, 74 Kembla Street Wollongong Part 402/19826
ContractorContractor ContractorWollongong Financial Services Pty Ltd
Address of ContractorAddress of Contractor Address of Contractor74 Kembla Street
Contractor SuburbContractor Suburb Contractor SuburbWollongong
Contractor PostcodeContractor Postcode Contractor Postcode2500
Related CompaniesRelated Companies Related CompaniesNA
Start DateStart Date Start Date14-Apr-2014
End DateEnd Date End Date14-Apr-2024
Contract amount( incl. GST)Contract amount( incl. GST) Contract amount( incl. GST)$819,920.00
Description of provision where amount can be variedDescription of provision where amount can be varied Description of provision where amount can be variedNA
Provisions for RenegotiationProvisions for Renegotiation Provisions for RenegotiationNA
Method of TenderingMethod of Tendering Method of TenderingNegotiated Contract
Provision for Operational or Maintenance ServicesProvision for Operational or Maintenance Services Provision for Operational or Maintenance ServicesNot Applicable
Particulars of Future Transfer of Significant Assets to the State at Zero CostParticulars of Future Transfer of Significant Assets to the State at Zero Cost Particulars of Future Transfer of Significant Assets to the State at Zero CostNA
Particulars of Future Transfer of Significant Assets to the Contractor including proposed transfer dateParticulars of Future Transfer of Significant Assets to the Contractor including proposed transfer date Particulars of Future Transfer of Significant Assets to the Contractor including proposed transfer dateNA
Results of Any Cost Benefit AnalysisResults of Any Cost Benefit Analysis Results of Any Cost Benefit AnalysisNA
A Summary of Information Used in the Full Base Case Financial ModelA Summary of Information Used in the Full Base Case Financial Model A Summary of Information Used in the Full Base Case Financial ModelNA
Particulars of How Risk Will Be Apportioned Between Parties if RelevantParticulars of How Risk Will Be Apportioned Between Parties if Relevant Particulars of How Risk Will Be Apportioned Between Parties if RelevantNA
Component and Quantum of Public Sector Comparator if usedComponent and Quantum of Public Sector Comparator if used Component and Quantum of Public Sector Comparator if usedNA
Particulars of Any Significant Guarantees or Undertakings Between the PartiesParticulars of Any Significant Guarantees or Undertakings Between the Parties Particulars of Any Significant Guarantees or Undertakings Between the PartiesNA
Particulars of Project / Goods / Services Provided, or Real Property to be Leased or Transferred Under ContractParticulars of Project / Goods / Services Provided, or Real Property to be Leased or Transferred Under Contract Particulars of Project / Goods / Services Provided, or Real Property to be Leased or Transferred Under ContractLease of Real Property
Any Other Key Elements of the ContractAny Other Key Elements of the Contract Any Other Key Elements of the ContractNA
Evaluation CriteriaEvaluation Criteria Evaluation CriteriaNA
Contract NumberContract Number Contract NumberTE114
Contract DescriptionContract Description Contract DescriptionStuart Park, Wollongong - Lagoon Restaurant, George Hanley Drive Pt Lot 2 DP 228880 Stuart Park Kiosk Lagoon
ContractorContractor ContractorEmibarb Pty Ltd
Address of ContractorAddress of Contractor Address of ContractorUnit 2, 73 Church Street
Contractor SuburbContractor Suburb Contractor SuburbWollongong
Contractor PostcodeContractor Postcode Contractor Postcode2500
Related CompaniesRelated Companies Related CompaniesNA
Start DateStart Date Start Date11-Jul-2006
End DateEnd Date End Date10-Jul-2026
Contract amount( incl. GST)Contract amount( incl. GST) Contract amount( incl. GST)$1,000,000.00
Description of provision where amount can be variedDescription of provision where amount can be varied Description of provision where amount can be variedNA
Provisions for RenegotiationProvisions for Renegotiation Provisions for RenegotiationNA
Method of TenderingMethod of Tendering Method of TenderingNegotiated Contract
Provision for Operational or Maintenance ServicesProvision for Operational or Maintenance Services Provision for Operational or Maintenance ServicesNot Applicable
Particulars of Future Transfer of Significant Assets to the State at Zero CostParticulars of Future Transfer of Significant Assets to the State at Zero Cost Particulars of Future Transfer of Significant Assets to the State at Zero CostNA
Particulars of Future Transfer of Significant Assets to the Contractor including proposed transfer dateParticulars of Future Transfer of Significant Assets to the Contractor including proposed transfer date Particulars of Future Transfer of Significant Assets to the Contractor including proposed transfer dateNA
Results of Any Cost Benefit AnalysisResults of Any Cost Benefit Analysis Results of Any Cost Benefit AnalysisNA
A Summary of Information Used in the Full Base Case Financial ModelA Summary of Information Used in the Full Base Case Financial Model A Summary of Information Used in the Full Base Case Financial ModelNA
Particulars of How Risk Will Be Apportioned Between Parties if RelevantParticulars of How Risk Will Be Apportioned Between Parties if Relevant Particulars of How Risk Will Be Apportioned Between Parties if RelevantNA
Component and Quantum of Public Sector Comparator if usedComponent and Quantum of Public Sector Comparator if used Component and Quantum of Public Sector Comparator if usedNA
Particulars of Any Significant Guarantees or Undertakings Between the PartiesParticulars of Any Significant Guarantees or Undertakings Between the Parties Particulars of Any Significant Guarantees or Undertakings Between the PartiesNA
Particulars of Project / Goods / Services Provided, or Real Property to be Leased or Transferred Under ContractParticulars of Project / Goods / Services Provided, or Real Property to be Leased or Transferred Under Contract Particulars of Project / Goods / Services Provided, or Real Property to be Leased or Transferred Under ContractLease of Real Property
Any Other Key Elements of the ContractAny Other Key Elements of the Contract Any Other Key Elements of the ContractNA
Evaluation CriteriaEvaluation Criteria Evaluation CriteriaNA
Contract NumberContract Number Contract NumberISJO 02/2018
Contract DescriptionContract Description Contract DescriptionLandfill Gas Management System
ContractorContractor ContractorLMS Energy Pty Ltd
Address of ContractorAddress of Contractor Address of Contractor79 King William Rd
Contractor SuburbContractor Suburb Contractor SuburbUnley, South Australia
Contractor PostcodeContractor Postcode Contractor Postcode5061
Related CompaniesRelated Companies Related CompaniesNA
Start DateStart Date Start Date10-Dec-2019
End DateEnd Date End Date10-Dec-2039
Contract amount( incl. GST)Contract amount( incl. GST) Contract amount( incl. GST)$2,000,000.00
Description of provision where amount can be variedDescription of provision where amount can be varied Description of provision where amount can be variedNA
Provisions for RenegotiationProvisions for Renegotiation Provisions for RenegotiationAs per terms of contract
Method of TenderingMethod of Tendering Method of TenderingNegotiated Contract
Provision for Operational or Maintenance ServicesProvision for Operational or Maintenance Services Provision for Operational or Maintenance ServicesNot Applicable
Particulars of Future Transfer of Significant Assets to the State at Zero CostParticulars of Future Transfer of Significant Assets to the State at Zero Cost Particulars of Future Transfer of Significant Assets to the State at Zero CostNA
Particulars of Future Transfer of Significant Assets to the Contractor including proposed transfer dateParticulars of Future Transfer of Significant Assets to the Contractor including proposed transfer date Particulars of Future Transfer of Significant Assets to the Contractor including proposed transfer dateNA
Results of Any Cost Benefit AnalysisResults of Any Cost Benefit Analysis Results of Any Cost Benefit AnalysisNA
A Summary of Information Used in the Full Base Case Financial ModelA Summary of Information Used in the Full Base Case Financial Model A Summary of Information Used in the Full Base Case Financial ModelNA
Particulars of How Risk Will Be Apportioned Between Parties if RelevantParticulars of How Risk Will Be Apportioned Between Parties if Relevant Particulars of How Risk Will Be Apportioned Between Parties if RelevantNA
Component and Quantum of Public Sector Comparator if usedComponent and Quantum of Public Sector Comparator if used Component and Quantum of Public Sector Comparator if usedNA
Particulars of Any Significant Guarantees or Undertakings Between the PartiesParticulars of Any Significant Guarantees or Undertakings Between the Parties Particulars of Any Significant Guarantees or Undertakings Between the PartiesNA
Particulars of Project / Goods / Services Provided, or Real Property to be Leased or Transferred Under ContractParticulars of Project / Goods / Services Provided, or Real Property to be Leased or Transferred Under Contract Particulars of Project / Goods / Services Provided, or Real Property to be Leased or Transferred Under ContractLandfill Gas Management System
Any Other Key Elements of the ContractAny Other Key Elements of the Contract Any Other Key Elements of the ContractNA
Evaluation CriteriaEvaluation Criteria Evaluation CriteriaRelevant experience & satisfactory performance in undertaking projects of similar size, scope and risk profile
Evaluation CriteriaMethodology, capability and capacity
Evaluation CriteriaEnvironmental and Work Health and Safety Management
Evaluation CriteriaCost to Council
Evaluation CriteriaStrengthening local economy
Contract NumberContract Number Contract NumberT17/60
Contract DescriptionContract Description Contract DescriptionWorkplace Health and Safety (WHS) Behaviour Program
ContractorContractor ContractorWilsons Consulting Group
Address of ContractorAddress of Contractor Address of ContractorUnit 19/3 Brown Street
Contractor SuburbContractor Suburb Contractor SuburbKIama
Contractor PostcodeContractor Postcode Contractor Postcode2533
Related CompaniesRelated Companies Related CompaniesNA
Start DateStart Date Start Date04-Jul-2018
End DateEnd Date End Date03-Jul-2021
Contract amount( incl. GST)Contract amount( incl. GST) Contract amount( incl. GST)$1,293,600.00
Description of provision where amount can be variedDescription of provision where amount can be varied Description of provision where amount can be variedNA
Provisions for RenegotiationProvisions for Renegotiation Provisions for RenegotiationNA
Method of TenderingMethod of Tendering Method of TenderingNegotiated Contract
Provision for Operational or Maintenance ServicesProvision for Operational or Maintenance Services Provision for Operational or Maintenance ServicesNot Applicable
Particulars of Future Transfer of Significant Assets to the State at Zero CostParticulars of Future Transfer of Significant Assets to the State at Zero Cost Particulars of Future Transfer of Significant Assets to the State at Zero CostNA
Particulars of Future Transfer of Significant Assets to the Contractor including proposed transfer dateParticulars of Future Transfer of Significant Assets to the Contractor including proposed transfer date Particulars of Future Transfer of Significant Assets to the Contractor including proposed transfer dateNA
Results of Any Cost Benefit AnalysisResults of Any Cost Benefit Analysis Results of Any Cost Benefit AnalysisNA
A Summary of Information Used in the Full Base Case Financial ModelA Summary of Information Used in the Full Base Case Financial Model A Summary of Information Used in the Full Base Case Financial ModelNA
Particulars of How Risk Will Be Apportioned Between Parties if RelevantParticulars of How Risk Will Be Apportioned Between Parties if Relevant Particulars of How Risk Will Be Apportioned Between Parties if RelevantNA
Component and Quantum of Public Sector Comparator if usedComponent and Quantum of Public Sector Comparator if used Component and Quantum of Public Sector Comparator if usedNA
Particulars of Any Significant Guarantees or Undertakings Between the PartiesParticulars of Any Significant Guarantees or Undertakings Between the Parties Particulars of Any Significant Guarantees or Undertakings Between the PartiesNA
Particulars of Project / Goods / Services Provided, or Real Property to be Leased or Transferred Under ContractParticulars of Project / Goods / Services Provided, or Real Property to be Leased or Transferred Under Contract Particulars of Project / Goods / Services Provided, or Real Property to be Leased or Transferred Under ContractDevelopment and Consultation on the WHS Behaviour Program
Any Other Key Elements of the ContractAny Other Key Elements of the Contract Any Other Key Elements of the ContractNA
Evaluation CriteriaEvaluation Criteria Evaluation CriteriaCost to Council - Consultancy and training costs per day
Evaluation CriteriaDemonstrable evidence in partnering with large and diverse organisations, including governmentagencies, in delivering WHS and environment behavioural cultural change programs andorganisational structures which enable sustainable legislative compliance
Evaluation CriteriaDemonstrable track record in enabling significant reduction in WHS, injury management and workerscompensation cost drivers ?
Evaluation CriteriaDemonstrated evidence in improving WHS and environment capabilities through leadership,engagement and learning and development programs and initiatives
Evaluation CriteriaCapability and qualifications of key personnel to deliver a behavioural safety and cultural changeprogram applying proven effective project management methodology
Evaluation CriteriaDemonstrated experience in simplifying WHS systems, standards, procedures and reportingprocesses particularly using technological solutions
Evaluation CriteriaSubmission of a detailed program that defines the approach and methodology to partner withCouncil
Evaluation CriteriaDemonstrated strengthening of local economic capacity
Contract NumberContract Number Contract NumberTE0179
Contract DescriptionContract Description Contract DescriptionSea Salt on Bulli Beach - Café/Kiosk and Residence - Part Folio identifer 68/1102884 being Kiosk 1 at Lot 68 Trinity Row, Bulli
ContractorContractor ContractorBirjen Pty Lyd
Address of ContractorAddress of Contractor Address of Contractor68 Trinity Row
Contractor SuburbContractor Suburb Contractor SuburbBulli
Contractor PostcodeContractor Postcode Contractor Postcode2516
Related CompaniesRelated Companies Related CompaniesNA
Start DateStart Date Start Date02-Nov-2019
End DateEnd Date End Date01-Dec-2024
Contract amount( incl. GST)Contract amount( incl. GST) Contract amount( incl. GST)$2,145,000.00
Description of provision where amount can be variedDescription of provision where amount can be varied Description of provision where amount can be variedNA
Provisions for RenegotiationProvisions for Renegotiation Provisions for Renegotiation2 x 5 year options (1 x option exercised to-date)
Method of TenderingMethod of Tendering Method of TenderingNot Applicable
Provision for Operational or Maintenance ServicesProvision for Operational or Maintenance Services Provision for Operational or Maintenance ServicesNot Applicable
Particulars of Future Transfer of Significant Assets to the State at Zero CostParticulars of Future Transfer of Significant Assets to the State at Zero Cost Particulars of Future Transfer of Significant Assets to the State at Zero CostNA
Particulars of Future Transfer of Significant Assets to the Contractor including proposed transfer dateParticulars of Future Transfer of Significant Assets to the Contractor including proposed transfer date Particulars of Future Transfer of Significant Assets to the Contractor including proposed transfer dateNA
Results of Any Cost Benefit AnalysisResults of Any Cost Benefit Analysis Results of Any Cost Benefit AnalysisNA
A Summary of Information Used in the Full Base Case Financial ModelA Summary of Information Used in the Full Base Case Financial Model A Summary of Information Used in the Full Base Case Financial ModelNA
Particulars of How Risk Will Be Apportioned Between Parties if RelevantParticulars of How Risk Will Be Apportioned Between Parties if Relevant Particulars of How Risk Will Be Apportioned Between Parties if RelevantNA
Component and Quantum of Public Sector Comparator if usedComponent and Quantum of Public Sector Comparator if used Component and Quantum of Public Sector Comparator if usedNA
Particulars of Any Significant Guarantees or Undertakings Between the PartiesParticulars of Any Significant Guarantees or Undertakings Between the Parties Particulars of Any Significant Guarantees or Undertakings Between the PartiesNA
Particulars of Project / Goods / Services Provided, or Real Property to be Leased or Transferred Under ContractParticulars of Project / Goods / Services Provided, or Real Property to be Leased or Transferred Under Contract Particulars of Project / Goods / Services Provided, or Real Property to be Leased or Transferred Under ContractLease of Real Property
Any Other Key Elements of the ContractAny Other Key Elements of the Contract Any Other Key Elements of the ContractNA
Evaluation CriteriaEvaluation Criteria Evaluation CriteriaNA
Contract NumberContract Number Contract NumberT19/03A
Contract DescriptionContract Description Contract DescriptionPrincipal Design Consultant (Architect) for Warrawong Community Centre and Library
ContractorContractor ContractorFrancis-Jones Morehan Thorp Pty Ltd
Address of ContractorAddress of Contractor Address of ContractorLevel 5, King Street
Contractor SuburbContractor Suburb Contractor SuburbSydney
Contractor PostcodeContractor Postcode Contractor Postcode2000
Related CompaniesRelated Companies Related CompaniesNA
Start DateStart Date Start Date02-Mar-2020
End DateEnd Date End Date30-Jun-2022
Contract amount( incl. GST)Contract amount( incl. GST) Contract amount( incl. GST)$1,752,052.50
Description of provision where amount can be variedDescription of provision where amount can be varied Description of provision where amount can be variedNA
Provisions for RenegotiationProvisions for Renegotiation Provisions for RenegotiationNA
Method of TenderingMethod of Tendering Method of TenderingNegotiated Contract
Provision for Operational or Maintenance ServicesProvision for Operational or Maintenance Services Provision for Operational or Maintenance ServicesNot Applicable
Particulars of Future Transfer of Significant Assets to the State at Zero CostParticulars of Future Transfer of Significant Assets to the State at Zero Cost Particulars of Future Transfer of Significant Assets to the State at Zero CostNA
Particulars of Future Transfer of Significant Assets to the Contractor including proposed transfer dateParticulars of Future Transfer of Significant Assets to the Contractor including proposed transfer date Particulars of Future Transfer of Significant Assets to the Contractor including proposed transfer dateNA
Results of Any Cost Benefit AnalysisResults of Any Cost Benefit Analysis Results of Any Cost Benefit AnalysisNA
A Summary of Information Used in the Full Base Case Financial ModelA Summary of Information Used in the Full Base Case Financial Model A Summary of Information Used in the Full Base Case Financial ModelNA
Particulars of How Risk Will Be Apportioned Between Parties if RelevantParticulars of How Risk Will Be Apportioned Between Parties if Relevant Particulars of How Risk Will Be Apportioned Between Parties if RelevantNA
Component and Quantum of Public Sector Comparator if usedComponent and Quantum of Public Sector Comparator if used Component and Quantum of Public Sector Comparator if usedNA
Particulars of Any Significant Guarantees or Undertakings Between the PartiesParticulars of Any Significant Guarantees or Undertakings Between the Parties Particulars of Any Significant Guarantees or Undertakings Between the PartiesNA
Particulars of Project / Goods / Services Provided, or Real Property to be Leased or Transferred Under ContractParticulars of Project / Goods / Services Provided, or Real Property to be Leased or Transferred Under Contract Particulars of Project / Goods / Services Provided, or Real Property to be Leased or Transferred Under Contractappoint thePrincipal Design Consultant (Architect) which signals the commencement of the design stage of thisproject.
Any Other Key Elements of the ContractAny Other Key Elements of the Contract Any Other Key Elements of the ContractNA
Evaluation CriteriaEvaluation Criteria Evaluation CriteriaCost to Council
Evaluation CriteriaOutline Services Delivery Plan
Evaluation CriteriaProposed Key Personnel
Evaluation CriteriaProposed Key Sub-Consultants
Evaluation CriteriaDemonstrated strengthening of local economic capacity
Evaluation CriteriaScoring from Expression of Interest
Contract NumberContract Number Contract NumberLE14318
Contract DescriptionContract Description Contract DescriptionPost BillPay Agreement
ContractorContractor ContractorAustralia Postal Corporation
Address of ContractorAddress of Contractor Address of Contractor111 Bourke St,
Contractor SuburbContractor Suburb Contractor SuburbMelbourne
Contractor PostcodeContractor Postcode Contractor Postcode3000
Related CompaniesRelated Companies Related CompaniesNA
Start DateStart Date Start Date01-Oct-2020
End DateEnd Date End Date01-Oct-2023
Contract amount( incl. GST)Contract amount( incl. GST) Contract amount( incl. GST)$450,000.00
Description of provision where amount can be variedDescription of provision where amount can be varied Description of provision where amount can be variedNA
Provisions for RenegotiationProvisions for Renegotiation Provisions for RenegotiationNA
Method of TenderingMethod of Tendering Method of TenderingNegotiated Contract
Provision for Operational or Maintenance ServicesProvision for Operational or Maintenance Services Provision for Operational or Maintenance ServicesNot Applicable
Particulars of Future Transfer of Significant Assets to the State at Zero CostParticulars of Future Transfer of Significant Assets to the State at Zero Cost Particulars of Future Transfer of Significant Assets to the State at Zero CostNA
Particulars of Future Transfer of Significant Assets to the Contractor including proposed transfer dateParticulars of Future Transfer of Significant Assets to the Contractor including proposed transfer date Particulars of Future Transfer of Significant Assets to the Contractor including proposed transfer dateNA
Results of Any Cost Benefit AnalysisResults of Any Cost Benefit Analysis Results of Any Cost Benefit AnalysisNA
A Summary of Information Used in the Full Base Case Financial ModelA Summary of Information Used in the Full Base Case Financial Model A Summary of Information Used in the Full Base Case Financial ModelNA
Particulars of How Risk Will Be Apportioned Between Parties if RelevantParticulars of How Risk Will Be Apportioned Between Parties if Relevant Particulars of How Risk Will Be Apportioned Between Parties if RelevantNA
Component and Quantum of Public Sector Comparator if usedComponent and Quantum of Public Sector Comparator if used Component and Quantum of Public Sector Comparator if usedNA
Particulars of Any Significant Guarantees or Undertakings Between the PartiesParticulars of Any Significant Guarantees or Undertakings Between the Parties Particulars of Any Significant Guarantees or Undertakings Between the PartiesNA
Particulars of Project / Goods / Services Provided, or Real Property to be Leased or Transferred Under ContractParticulars of Project / Goods / Services Provided, or Real Property to be Leased or Transferred Under Contract Particulars of Project / Goods / Services Provided, or Real Property to be Leased or Transferred Under ContractBillpay service provision
Any Other Key Elements of the ContractAny Other Key Elements of the Contract Any Other Key Elements of the ContractNA
Evaluation CriteriaEvaluation Criteria Evaluation CriteriaNA
Contract NumberContract Number Contract NumberTE1249
Contract DescriptionContract Description Contract DescriptionLot 37 of DP534848 being 257 Keira Street, Wollongong
ContractorContractor ContractorWollongong Prestige Automotive Pty Ltd
Address of ContractorAddress of Contractor Address of Contractor257 Keira Street
Contractor SuburbContractor Suburb Contractor SuburbWollongong
Contractor PostcodeContractor Postcode Contractor Postcode2500
Related CompaniesRelated Companies Related CompaniesNA
Start DateStart Date Start Date01-May-2019
End DateEnd Date End Date31-Dec-2023
Contract amount( incl. GST)Contract amount( incl. GST) Contract amount( incl. GST)$216,702.20
Description of provision where amount can be variedDescription of provision where amount can be varied Description of provision where amount can be variedNA
Provisions for RenegotiationProvisions for Renegotiation Provisions for RenegotiationNA
Method of TenderingMethod of Tendering Method of TenderingNegotiated Contract
Provision for Operational or Maintenance ServicesProvision for Operational or Maintenance Services Provision for Operational or Maintenance ServicesNot Applicable
Particulars of Future Transfer of Significant Assets to the State at Zero CostParticulars of Future Transfer of Significant Assets to the State at Zero Cost Particulars of Future Transfer of Significant Assets to the State at Zero CostNA
Particulars of Future Transfer of Significant Assets to the Contractor including proposed transfer dateParticulars of Future Transfer of Significant Assets to the Contractor including proposed transfer date Particulars of Future Transfer of Significant Assets to the Contractor including proposed transfer dateNA
Results of Any Cost Benefit AnalysisResults of Any Cost Benefit Analysis Results of Any Cost Benefit AnalysisNA
A Summary of Information Used in the Full Base Case Financial ModelA Summary of Information Used in the Full Base Case Financial Model A Summary of Information Used in the Full Base Case Financial ModelNA
Particulars of How Risk Will Be Apportioned Between Parties if RelevantParticulars of How Risk Will Be Apportioned Between Parties if Relevant Particulars of How Risk Will Be Apportioned Between Parties if RelevantNA
Component and Quantum of Public Sector Comparator if usedComponent and Quantum of Public Sector Comparator if used Component and Quantum of Public Sector Comparator if usedNA
Particulars of Any Significant Guarantees or Undertakings Between the PartiesParticulars of Any Significant Guarantees or Undertakings Between the Parties Particulars of Any Significant Guarantees or Undertakings Between the PartiesNA
Particulars of Project / Goods / Services Provided, or Real Property to be Leased or Transferred Under ContractParticulars of Project / Goods / Services Provided, or Real Property to be Leased or Transferred Under Contract Particulars of Project / Goods / Services Provided, or Real Property to be Leased or Transferred Under ContractLease of Real Property
Any Other Key Elements of the ContractAny Other Key Elements of the Contract Any Other Key Elements of the ContractNA
Evaluation CriteriaEvaluation Criteria Evaluation CriteriaNA
Contract NumberContract Number Contract NumberTE14
Contract DescriptionContract Description Contract DescriptionGeorge Hanley Drive Pt Lot 2 Dp 228880 North Beach Kiosk Lease including Diggies - Crinis Lot 70 DP 751299 North Beach Kiosk/Rest-Cliff Road Wollongong - Diggies
ContractorContractor ContractorNorth Kiosk Pty Ltd
Address of ContractorAddress of Contractor Address of Contractor1 Cliff Road
Contractor SuburbContractor Suburb Contractor SuburbNorth Wollongong
Contractor PostcodeContractor Postcode Contractor Postcode2500
Related CompaniesRelated Companies Related CompaniesNA
Start DateStart Date Start Date01-May-2003
End DateEnd Date End Date30-Apr-2023
Contract amount( incl. GST)Contract amount( incl. GST) Contract amount( incl. GST)$1,276,000.00
Description of provision where amount can be variedDescription of provision where amount can be varied Description of provision where amount can be variedNA
Provisions for RenegotiationProvisions for Renegotiation Provisions for Renegotiation2 x 5 year options
Method of TenderingMethod of Tendering Method of TenderingNegotiated Contract
Provision for Operational or Maintenance ServicesProvision for Operational or Maintenance Services Provision for Operational or Maintenance ServicesNot Applicable
Particulars of Future Transfer of Significant Assets to the State at Zero CostParticulars of Future Transfer of Significant Assets to the State at Zero Cost Particulars of Future Transfer of Significant Assets to the State at Zero CostNA
Particulars of Future Transfer of Significant Assets to the Contractor including proposed transfer dateParticulars of Future Transfer of Significant Assets to the Contractor including proposed transfer date Particulars of Future Transfer of Significant Assets to the Contractor including proposed transfer dateNA
Results of Any Cost Benefit AnalysisResults of Any Cost Benefit Analysis Results of Any Cost Benefit AnalysisNA
A Summary of Information Used in the Full Base Case Financial ModelA Summary of Information Used in the Full Base Case Financial Model A Summary of Information Used in the Full Base Case Financial ModelNA
Particulars of How Risk Will Be Apportioned Between Parties if RelevantParticulars of How Risk Will Be Apportioned Between Parties if Relevant Particulars of How Risk Will Be Apportioned Between Parties if RelevantNA
Component and Quantum of Public Sector Comparator if usedComponent and Quantum of Public Sector Comparator if used Component and Quantum of Public Sector Comparator if usedNA
Particulars of Any Significant Guarantees or Undertakings Between the PartiesParticulars of Any Significant Guarantees or Undertakings Between the Parties Particulars of Any Significant Guarantees or Undertakings Between the PartiesNA
Particulars of Project / Goods / Services Provided, or Real Property to be Leased or Transferred Under ContractParticulars of Project / Goods / Services Provided, or Real Property to be Leased or Transferred Under Contract Particulars of Project / Goods / Services Provided, or Real Property to be Leased or Transferred Under ContractLease of Real Property
Any Other Key Elements of the ContractAny Other Key Elements of the Contract Any Other Key Elements of the ContractNA
Evaluation CriteriaEvaluation Criteria Evaluation CriteriaNA
Contract NumberContract Number Contract NumberLE13799
Contract DescriptionContract Description Contract DescriptionPart Lot 102 DP 847615 Springhill Road Coniston
ContractorContractor ContractorTouchdown Helicopters Pty Ltd
Address of ContractorAddress of Contractor Address of ContractorPO Box 1010,
Contractor SuburbContractor Suburb Contractor SuburbAlbion Park, NSW
Contractor PostcodeContractor Postcode Contractor Postcode2527
Related CompaniesRelated Companies Related CompaniesNA
Start DateStart Date Start Date01-Mar-2020
End DateEnd Date End Date28-Feb-2025
Contract amount( incl. GST)Contract amount( incl. GST) Contract amount( incl. GST)$232,076.00
Description of provision where amount can be variedDescription of provision where amount can be varied Description of provision where amount can be variedNA
Provisions for RenegotiationProvisions for Renegotiation Provisions for RenegotiationNA
Method of TenderingMethod of Tendering Method of TenderingNot Applicable
Provision for Operational or Maintenance ServicesProvision for Operational or Maintenance Services Provision for Operational or Maintenance ServicesNot Applicable
Particulars of Future Transfer of Significant Assets to the State at Zero CostParticulars of Future Transfer of Significant Assets to the State at Zero Cost Particulars of Future Transfer of Significant Assets to the State at Zero CostNA
Particulars of Future Transfer of Significant Assets to the Contractor including proposed transfer dateParticulars of Future Transfer of Significant Assets to the Contractor including proposed transfer date Particulars of Future Transfer of Significant Assets to the Contractor including proposed transfer dateNA
Results of Any Cost Benefit AnalysisResults of Any Cost Benefit Analysis Results of Any Cost Benefit AnalysisNA
A Summary of Information Used in the Full Base Case Financial ModelA Summary of Information Used in the Full Base Case Financial Model A Summary of Information Used in the Full Base Case Financial ModelNA
Particulars of How Risk Will Be Apportioned Between Parties if RelevantParticulars of How Risk Will Be Apportioned Between Parties if Relevant Particulars of How Risk Will Be Apportioned Between Parties if RelevantNA
Component and Quantum of Public Sector Comparator if usedComponent and Quantum of Public Sector Comparator if used Component and Quantum of Public Sector Comparator if usedNA
Particulars of Any Significant Guarantees or Undertakings Between the PartiesParticulars of Any Significant Guarantees or Undertakings Between the Parties Particulars of Any Significant Guarantees or Undertakings Between the PartiesNA
Particulars of Project / Goods / Services Provided, or Real Property to be Leased or Transferred Under ContractParticulars of Project / Goods / Services Provided, or Real Property to be Leased or Transferred Under Contract Particulars of Project / Goods / Services Provided, or Real Property to be Leased or Transferred Under ContractLease of Real Property
Any Other Key Elements of the ContractAny Other Key Elements of the Contract Any Other Key Elements of the ContractNA
Evaluation CriteriaEvaluation Criteria Evaluation CriteriaNA
Contract NumberContract Number Contract NumberTE17
Contract DescriptionContract Description Contract DescriptionFairy Meadow Bowls Club, Cambridge Ave Lot 101 DP 624706 Fairy Meadow
ContractorContractor ContractorFairy Meadow Bowls and Recreation Club Ltd
Address of ContractorAddress of Contractor Address of ContractorLot 101 Cambridge Avenue
Contractor SuburbContractor Suburb Contractor SuburbFairy Meadow
Contractor PostcodeContractor Postcode Contractor Postcode2519
Related CompaniesRelated Companies Related CompaniesNA
Start DateStart Date Start Date01-Jun-2005
End DateEnd Date End Date30-Jun-2021
Contract amount( incl. GST)Contract amount( incl. GST) Contract amount( incl. GST)$326,388.69
Description of provision where amount can be variedDescription of provision where amount can be varied Description of provision where amount can be variedNA
Provisions for RenegotiationProvisions for Renegotiation Provisions for RenegotiationEvery 5th anniversary by CPI, every other 1 year anniversary - current market rental
Method of TenderingMethod of Tendering Method of TenderingNegotiated Contract
Provision for Operational or Maintenance ServicesProvision for Operational or Maintenance Services Provision for Operational or Maintenance ServicesNot Applicable
Particulars of Future Transfer of Significant Assets to the State at Zero CostParticulars of Future Transfer of Significant Assets to the State at Zero Cost Particulars of Future Transfer of Significant Assets to the State at Zero CostNA
Particulars of Future Transfer of Significant Assets to the Contractor including proposed transfer dateParticulars of Future Transfer of Significant Assets to the Contractor including proposed transfer date Particulars of Future Transfer of Significant Assets to the Contractor including proposed transfer dateNA
Results of Any Cost Benefit AnalysisResults of Any Cost Benefit Analysis Results of Any Cost Benefit AnalysisNA
A Summary of Information Used in the Full Base Case Financial ModelA Summary of Information Used in the Full Base Case Financial Model A Summary of Information Used in the Full Base Case Financial ModelNA
Particulars of How Risk Will Be Apportioned Between Parties if RelevantParticulars of How Risk Will Be Apportioned Between Parties if Relevant Particulars of How Risk Will Be Apportioned Between Parties if RelevantNA
Component and Quantum of Public Sector Comparator if usedComponent and Quantum of Public Sector Comparator if used Component and Quantum of Public Sector Comparator if usedNA
Particulars of Any Significant Guarantees or Undertakings Between the PartiesParticulars of Any Significant Guarantees or Undertakings Between the Parties Particulars of Any Significant Guarantees or Undertakings Between the PartiesNA
Particulars of Project / Goods / Services Provided, or Real Property to be Leased or Transferred Under ContractParticulars of Project / Goods / Services Provided, or Real Property to be Leased or Transferred Under Contract Particulars of Project / Goods / Services Provided, or Real Property to be Leased or Transferred Under ContractLease of Real Property
Any Other Key Elements of the ContractAny Other Key Elements of the Contract Any Other Key Elements of the ContractNA
Evaluation CriteriaEvaluation Criteria Evaluation CriteriaNA
Contract NumberContract Number Contract NumberTE1285
Contract DescriptionContract Description Contract DescriptionPart Lot 1 DP1083116 Bulli known as Sublime Point Kiosk
ContractorContractor ContractorAlex Marlos
Address of ContractorAddress of Contractor Address of Contractor45 Brentwood Avenue
Contractor SuburbContractor Suburb Contractor SuburbFigtree
Contractor PostcodeContractor Postcode Contractor Postcode2525
Related CompaniesRelated Companies Related CompaniesNA
Start DateStart Date Start Date01-Jul-2015
End DateEnd Date End Date31-Dec-2021
Contract amount( incl. GST)Contract amount( incl. GST) Contract amount( incl. GST)$243,501.00
Description of provision where amount can be variedDescription of provision where amount can be varied Description of provision where amount can be variedNA
Provisions for RenegotiationProvisions for Renegotiation Provisions for RenegotiationNA
Method of TenderingMethod of Tendering Method of TenderingNot Applicable
Provision for Operational or Maintenance ServicesProvision for Operational or Maintenance Services Provision for Operational or Maintenance ServicesNot Applicable
Particulars of Future Transfer of Significant Assets to the State at Zero CostParticulars of Future Transfer of Significant Assets to the State at Zero Cost Particulars of Future Transfer of Significant Assets to the State at Zero CostNA
Particulars of Future Transfer of Significant Assets to the Contractor including proposed transfer dateParticulars of Future Transfer of Significant Assets to the Contractor including proposed transfer date Particulars of Future Transfer of Significant Assets to the Contractor including proposed transfer dateNA
Results of Any Cost Benefit AnalysisResults of Any Cost Benefit Analysis Results of Any Cost Benefit AnalysisNA
A Summary of Information Used in the Full Base Case Financial ModelA Summary of Information Used in the Full Base Case Financial Model A Summary of Information Used in the Full Base Case Financial ModelNA
Particulars of How Risk Will Be Apportioned Between Parties if RelevantParticulars of How Risk Will Be Apportioned Between Parties if Relevant Particulars of How Risk Will Be Apportioned Between Parties if RelevantNA
Component and Quantum of Public Sector Comparator if usedComponent and Quantum of Public Sector Comparator if used Component and Quantum of Public Sector Comparator if usedNA
Particulars of Any Significant Guarantees or Undertakings Between the PartiesParticulars of Any Significant Guarantees or Undertakings Between the Parties Particulars of Any Significant Guarantees or Undertakings Between the PartiesNA
Particulars of Project / Goods / Services Provided, or Real Property to be Leased or Transferred Under ContractParticulars of Project / Goods / Services Provided, or Real Property to be Leased or Transferred Under Contract Particulars of Project / Goods / Services Provided, or Real Property to be Leased or Transferred Under ContractLease of Real Property
Any Other Key Elements of the ContractAny Other Key Elements of the Contract Any Other Key Elements of the ContractNA
Evaluation CriteriaEvaluation Criteria Evaluation CriteriaNA
Contract NumberContract Number Contract NumberTE227
Contract DescriptionContract Description Contract DescriptionWollongong Surf Leisure Resort DP730059 Lot 501 Towradgi
ContractorContractor ContractorJohn Bruce Gibson
Address of ContractorAddress of Contractor Address of Contractor210 Pioneer Road
Contractor SuburbContractor Suburb Contractor SuburbFairy Meadow
Contractor PostcodeContractor Postcode Contractor Postcode2519
Related CompaniesRelated Companies Related CompaniesNA
Start DateStart Date Start Date01-Jul-2013
End DateEnd Date End Date01-Jul-2022
Contract amount( incl. GST)Contract amount( incl. GST) Contract amount( incl. GST)$4,290,000.00
Description of provision where amount can be variedDescription of provision where amount can be varied Description of provision where amount can be variedNA
Provisions for RenegotiationProvisions for Renegotiation Provisions for RenegotiationOption to renew for a period of 2 x 5 years
Method of TenderingMethod of Tendering Method of TenderingNot Applicable
Provision for Operational or Maintenance ServicesProvision for Operational or Maintenance Services Provision for Operational or Maintenance ServicesNot Applicable
Particulars of Future Transfer of Significant Assets to the State at Zero CostParticulars of Future Transfer of Significant Assets to the State at Zero Cost Particulars of Future Transfer of Significant Assets to the State at Zero CostNA
Particulars of Future Transfer of Significant Assets to the Contractor including proposed transfer dateParticulars of Future Transfer of Significant Assets to the Contractor including proposed transfer date Particulars of Future Transfer of Significant Assets to the Contractor including proposed transfer dateNA
Results of Any Cost Benefit AnalysisResults of Any Cost Benefit Analysis Results of Any Cost Benefit AnalysisNA
A Summary of Information Used in the Full Base Case Financial ModelA Summary of Information Used in the Full Base Case Financial Model A Summary of Information Used in the Full Base Case Financial ModelNA
Particulars of How Risk Will Be Apportioned Between Parties if RelevantParticulars of How Risk Will Be Apportioned Between Parties if Relevant Particulars of How Risk Will Be Apportioned Between Parties if RelevantNA
Component and Quantum of Public Sector Comparator if usedComponent and Quantum of Public Sector Comparator if used Component and Quantum of Public Sector Comparator if usedNA
Particulars of Any Significant Guarantees or Undertakings Between the PartiesParticulars of Any Significant Guarantees or Undertakings Between the Parties Particulars of Any Significant Guarantees or Undertakings Between the PartiesNA
Particulars of Project / Goods / Services Provided, or Real Property to be Leased or Transferred Under ContractParticulars of Project / Goods / Services Provided, or Real Property to be Leased or Transferred Under Contract Particulars of Project / Goods / Services Provided, or Real Property to be Leased or Transferred Under ContractLease of real property
Any Other Key Elements of the ContractAny Other Key Elements of the Contract Any Other Key Elements of the ContractNA
Evaluation CriteriaEvaluation Criteria Evaluation CriteriaNA
Contract NumberContract Number Contract NumberTE1350
Contract DescriptionContract Description Contract DescriptionSouthern Gateway - Gelato Emporium ( Sub Lease) - Gateway Centre within Reserve 1004388
ContractorContractor ContractorGiacomo Robert di Francesca, Laura di Francesca and Giovanna Lidia di Francesca
Address of ContractorAddress of Contractor Address of Contractor90 Manildra Road
Contractor SuburbContractor Suburb Contractor SuburbMolong
Contractor PostcodeContractor Postcode Contractor Postcode2866
Related CompaniesRelated Companies Related CompaniesNA
Start DateStart Date Start Date01-Jul-2013
End DateEnd Date End Date30-Jun-2023
Contract amount( incl. GST)Contract amount( incl. GST) Contract amount( incl. GST)$715,275.00
Description of provision where amount can be variedDescription of provision where amount can be varied Description of provision where amount can be variedNA
Provisions for RenegotiationProvisions for Renegotiation Provisions for RenegotiationOption to renew for a period of 2 x 5 years
Method of TenderingMethod of Tendering Method of TenderingNegotiated Contract
Provision for Operational or Maintenance ServicesProvision for Operational or Maintenance Services Provision for Operational or Maintenance ServicesNot Applicable
Particulars of Future Transfer of Significant Assets to the State at Zero CostParticulars of Future Transfer of Significant Assets to the State at Zero Cost Particulars of Future Transfer of Significant Assets to the State at Zero CostNA
Particulars of Future Transfer of Significant Assets to the Contractor including proposed transfer dateParticulars of Future Transfer of Significant Assets to the Contractor including proposed transfer date Particulars of Future Transfer of Significant Assets to the Contractor including proposed transfer dateNA
Results of Any Cost Benefit AnalysisResults of Any Cost Benefit Analysis Results of Any Cost Benefit AnalysisNA
A Summary of Information Used in the Full Base Case Financial ModelA Summary of Information Used in the Full Base Case Financial Model A Summary of Information Used in the Full Base Case Financial ModelNA
Particulars of How Risk Will Be Apportioned Between Parties if RelevantParticulars of How Risk Will Be Apportioned Between Parties if Relevant Particulars of How Risk Will Be Apportioned Between Parties if RelevantNA
Component and Quantum of Public Sector Comparator if usedComponent and Quantum of Public Sector Comparator if used Component and Quantum of Public Sector Comparator if usedNA
Particulars of Any Significant Guarantees or Undertakings Between the PartiesParticulars of Any Significant Guarantees or Undertakings Between the Parties Particulars of Any Significant Guarantees or Undertakings Between the PartiesNA
Particulars of Project / Goods / Services Provided, or Real Property to be Leased or Transferred Under ContractParticulars of Project / Goods / Services Provided, or Real Property to be Leased or Transferred Under Contract Particulars of Project / Goods / Services Provided, or Real Property to be Leased or Transferred Under ContractLease of Real property
Any Other Key Elements of the ContractAny Other Key Elements of the Contract Any Other Key Elements of the ContractNA
Evaluation CriteriaEvaluation Criteria Evaluation CriteriaNA
Contract NumberContract Number Contract NumberTE06
Contract DescriptionContract Description Contract DescriptionGlennifer Brae and Outbuildings, Identifier 3/252694 Manor House and Buildings A, B, C, D
ContractorContractor ContractorWollongong Conservatorium of Music Ltd
Address of ContractorAddress of Contractor Address of ContractorPO Box 62
Contractor SuburbContractor Suburb Contractor SuburbKeiraville
Contractor PostcodeContractor Postcode Contractor Postcode2500
Related CompaniesRelated Companies Related CompaniesNA
Start DateStart Date Start Date01-Jul-2003
End DateEnd Date End Date30-Jun-2023
Contract amount( incl. GST)Contract amount( incl. GST) Contract amount( incl. GST)$952,800.00
Description of provision where amount can be variedDescription of provision where amount can be varied Description of provision where amount can be variedNA
Provisions for RenegotiationProvisions for Renegotiation Provisions for Renegotiation2 x 5 year options to renew - exercised
Method of TenderingMethod of Tendering Method of TenderingNegotiated Contract
Provision for Operational or Maintenance ServicesProvision for Operational or Maintenance Services Provision for Operational or Maintenance ServicesNot Applicable
Particulars of Future Transfer of Significant Assets to the State at Zero CostParticulars of Future Transfer of Significant Assets to the State at Zero Cost Particulars of Future Transfer of Significant Assets to the State at Zero CostNA
Particulars of Future Transfer of Significant Assets to the Contractor including proposed transfer dateParticulars of Future Transfer of Significant Assets to the Contractor including proposed transfer date Particulars of Future Transfer of Significant Assets to the Contractor including proposed transfer dateNA
Results of Any Cost Benefit AnalysisResults of Any Cost Benefit Analysis Results of Any Cost Benefit AnalysisNA
A Summary of Information Used in the Full Base Case Financial ModelA Summary of Information Used in the Full Base Case Financial Model A Summary of Information Used in the Full Base Case Financial ModelNA
Particulars of How Risk Will Be Apportioned Between Parties if RelevantParticulars of How Risk Will Be Apportioned Between Parties if Relevant Particulars of How Risk Will Be Apportioned Between Parties if RelevantNA
Component and Quantum of Public Sector Comparator if usedComponent and Quantum of Public Sector Comparator if used Component and Quantum of Public Sector Comparator if usedNA
Particulars of Any Significant Guarantees or Undertakings Between the PartiesParticulars of Any Significant Guarantees or Undertakings Between the Parties Particulars of Any Significant Guarantees or Undertakings Between the PartiesNA
Particulars of Project / Goods / Services Provided, or Real Property to be Leased or Transferred Under ContractParticulars of Project / Goods / Services Provided, or Real Property to be Leased or Transferred Under Contract Particulars of Project / Goods / Services Provided, or Real Property to be Leased or Transferred Under ContractLease of real property
Any Other Key Elements of the ContractAny Other Key Elements of the Contract Any Other Key Elements of the ContractNA
Evaluation CriteriaEvaluation Criteria Evaluation CriteriaNA
Contract NumberContract Number Contract NumberLE5297
Contract DescriptionContract Description Contract DescriptionLease: Wollongong City Council from Dapto Agricultural and Horticultural Society Incorporated Dapto Ribonwood Centre
ContractorContractor ContractorDapto Agricultural and Horitcultural Society Incorporated
Address of ContractorAddress of Contractor Address of Contractor89 Princes Highway
Contractor SuburbContractor Suburb Contractor SuburbDapto
Contractor PostcodeContractor Postcode Contractor Postcode2530
Related CompaniesRelated Companies Related CompaniesNA
Start DateStart Date Start Date01-Jul-1999
End DateEnd Date End Date30-Jul-2029
Contract amount( incl. GST)Contract amount( incl. GST) Contract amount( incl. GST)$2,070,000.00
Description of provision where amount can be variedDescription of provision where amount can be varied Description of provision where amount can be variedNA
Provisions for RenegotiationProvisions for Renegotiation Provisions for RenegotiationNA
Method of TenderingMethod of Tendering Method of TenderingNegotiated Contract
Provision for Operational or Maintenance ServicesProvision for Operational or Maintenance Services Provision for Operational or Maintenance ServicesNot Applicable
Particulars of Future Transfer of Significant Assets to the State at Zero CostParticulars of Future Transfer of Significant Assets to the State at Zero Cost Particulars of Future Transfer of Significant Assets to the State at Zero CostNA
Particulars of Future Transfer of Significant Assets to the Contractor including proposed transfer dateParticulars of Future Transfer of Significant Assets to the Contractor including proposed transfer date Particulars of Future Transfer of Significant Assets to the Contractor including proposed transfer dateNA
Results of Any Cost Benefit AnalysisResults of Any Cost Benefit Analysis Results of Any Cost Benefit AnalysisNA
A Summary of Information Used in the Full Base Case Financial ModelA Summary of Information Used in the Full Base Case Financial Model A Summary of Information Used in the Full Base Case Financial ModelNA
Particulars of How Risk Will Be Apportioned Between Parties if RelevantParticulars of How Risk Will Be Apportioned Between Parties if Relevant Particulars of How Risk Will Be Apportioned Between Parties if RelevantNA
Component and Quantum of Public Sector Comparator if usedComponent and Quantum of Public Sector Comparator if used Component and Quantum of Public Sector Comparator if usedNA
Particulars of Any Significant Guarantees or Undertakings Between the PartiesParticulars of Any Significant Guarantees or Undertakings Between the Parties Particulars of Any Significant Guarantees or Undertakings Between the PartiesNA
Particulars of Project / Goods / Services Provided, or Real Property to be Leased or Transferred Under ContractParticulars of Project / Goods / Services Provided, or Real Property to be Leased or Transferred Under Contract Particulars of Project / Goods / Services Provided, or Real Property to be Leased or Transferred Under ContractLease of Dapto Ribbonwood Centre
Any Other Key Elements of the ContractAny Other Key Elements of the Contract Any Other Key Elements of the ContractNA
Evaluation CriteriaEvaluation Criteria Evaluation CriteriaNA
Contract NumberContract Number Contract NumberLE14225
Contract DescriptionContract Description Contract DescriptionLot A DP 163914 and Lot 1 DP 998751 - 283 - 285 Keira Street Wollongong
ContractorContractor ContractorSave the Children Australia
Address of ContractorAddress of Contractor Address of Contractor33 Lincoln Square
Contractor SuburbContractor Suburb Contractor SuburbSouth Carlton, Victoria
Contractor PostcodeContractor Postcode Contractor Postcode3053
Related CompaniesRelated Companies Related CompaniesNA
Start DateStart Date Start Date01-Dec-2019
End DateEnd Date End Date30-Nov-2023
Contract amount( incl. GST)Contract amount( incl. GST) Contract amount( incl. GST)$294,000.00
Description of provision where amount can be variedDescription of provision where amount can be varied Description of provision where amount can be variedNA
Provisions for RenegotiationProvisions for Renegotiation Provisions for RenegotiationNA
Method of TenderingMethod of Tendering Method of TenderingNot Applicable
Provision for Operational or Maintenance ServicesProvision for Operational or Maintenance Services Provision for Operational or Maintenance ServicesNot Applicable
Particulars of Future Transfer of Significant Assets to the State at Zero CostParticulars of Future Transfer of Significant Assets to the State at Zero Cost Particulars of Future Transfer of Significant Assets to the State at Zero CostNA
Particulars of Future Transfer of Significant Assets to the Contractor including proposed transfer dateParticulars of Future Transfer of Significant Assets to the Contractor including proposed transfer date Particulars of Future Transfer of Significant Assets to the Contractor including proposed transfer dateNA
Results of Any Cost Benefit AnalysisResults of Any Cost Benefit Analysis Results of Any Cost Benefit AnalysisNA
A Summary of Information Used in the Full Base Case Financial ModelA Summary of Information Used in the Full Base Case Financial Model A Summary of Information Used in the Full Base Case Financial ModelNA
Particulars of How Risk Will Be Apportioned Between Parties if RelevantParticulars of How Risk Will Be Apportioned Between Parties if Relevant Particulars of How Risk Will Be Apportioned Between Parties if RelevantNA
Component and Quantum of Public Sector Comparator if usedComponent and Quantum of Public Sector Comparator if used Component and Quantum of Public Sector Comparator if usedNA
Particulars of Any Significant Guarantees or Undertakings Between the PartiesParticulars of Any Significant Guarantees or Undertakings Between the Parties Particulars of Any Significant Guarantees or Undertakings Between the PartiesNA
Particulars of Project / Goods / Services Provided, or Real Property to be Leased or Transferred Under ContractParticulars of Project / Goods / Services Provided, or Real Property to be Leased or Transferred Under Contract Particulars of Project / Goods / Services Provided, or Real Property to be Leased or Transferred Under ContractLease of Real Property
Any Other Key Elements of the ContractAny Other Key Elements of the Contract Any Other Key Elements of the ContractNA
Evaluation CriteriaEvaluation Criteria Evaluation CriteriaNA
Contract NumberContract Number Contract NumberTE189
Contract DescriptionContract Description Contract Description277 Keira Street Wollongong, Lot 200 DP857693
ContractorContractor ContractorGoodyear & Dunlop Tyres (Aust) Pty Ltd
Address of ContractorAddress of Contractor Address of ContractorLevel 1, 630 Church Street
Contractor SuburbContractor Suburb Contractor SuburbRichmond Vic
Contractor PostcodeContractor Postcode Contractor Postcode3121
Related CompaniesRelated Companies Related CompaniesNA
Start DateStart Date Start Date01-Dec-2015
End DateEnd Date End Date30-Nov-2023
Contract amount( incl. GST)Contract amount( incl. GST) Contract amount( incl. GST)$500,024.80
Description of provision where amount can be variedDescription of provision where amount can be varied Description of provision where amount can be variedNA
Provisions for RenegotiationProvisions for Renegotiation Provisions for RenegotiationNA
Method of TenderingMethod of Tendering Method of TenderingNot Applicable
Provision for Operational or Maintenance ServicesProvision for Operational or Maintenance Services Provision for Operational or Maintenance ServicesNot Applicable
Particulars of Future Transfer of Significant Assets to the State at Zero CostParticulars of Future Transfer of Significant Assets to the State at Zero Cost Particulars of Future Transfer of Significant Assets to the State at Zero CostNA
Particulars of Future Transfer of Significant Assets to the Contractor including proposed transfer dateParticulars of Future Transfer of Significant Assets to the Contractor including proposed transfer date Particulars of Future Transfer of Significant Assets to the Contractor including proposed transfer dateNA
Results of Any Cost Benefit AnalysisResults of Any Cost Benefit Analysis Results of Any Cost Benefit AnalysisNA
A Summary of Information Used in the Full Base Case Financial ModelA Summary of Information Used in the Full Base Case Financial Model A Summary of Information Used in the Full Base Case Financial ModelNA
Particulars of How Risk Will Be Apportioned Between Parties if RelevantParticulars of How Risk Will Be Apportioned Between Parties if Relevant Particulars of How Risk Will Be Apportioned Between Parties if RelevantNA
Component and Quantum of Public Sector Comparator if usedComponent and Quantum of Public Sector Comparator if used Component and Quantum of Public Sector Comparator if usedNA
Particulars of Any Significant Guarantees or Undertakings Between the PartiesParticulars of Any Significant Guarantees or Undertakings Between the Parties Particulars of Any Significant Guarantees or Undertakings Between the PartiesNA
Particulars of Project / Goods / Services Provided, or Real Property to be Leased or Transferred Under ContractParticulars of Project / Goods / Services Provided, or Real Property to be Leased or Transferred Under Contract Particulars of Project / Goods / Services Provided, or Real Property to be Leased or Transferred Under ContractLease of Real Property
Any Other Key Elements of the ContractAny Other Key Elements of the Contract Any Other Key Elements of the ContractNA
Evaluation CriteriaEvaluation Criteria Evaluation CriteriaNA