Notice: COVID-19 support available for residents and businesses Read more.
Notice: Stay safe - see our latest COVID-19 updates Read more.
Use space to open navigation items
Wollongong City Council

Graffiti Removal Register

Showing 1 - 100 of 1830 items
OwnershipOwnership DescriptionDescription ActionAction Date StartedDate Started Date CompletedDate Completed CostCost StatusStatus
OwnershipWCC DescriptionBus Shelter 3162 Lighthorse Drive (Railway Pde Woonona to Pendlebury Pde) ActionGraffiti Removal Date Started15-09-2021 Date Completed Cost$0 StatusIn Progress
OwnershipWCC DescriptionJim Allan Oval Illawarra Park - Changerooms/Toilets ActionGraffiti Removal Date Started15-09-2021 Date Completed Cost$335.29 StatusIn Progress
OwnershipWCC DescriptionCorrimal SLSC ActionGraffiti Removal Date Started15-09-2021 Date Completed Cost$0 StatusIn Progress
OwnershipWCC DescriptionFlagstaff Hill Lions Park Lighthouse and Surrounds ActionGraffiti Removal Date Started15-09-2021 Date Completed Cost$0 StatusIn Progress
OwnershipWCC DescriptionFlagstaff Hill Lions Park Lighthouse and Surrounds ActionGraffiti Removal Date Started15-09-2021 Date Completed Cost$0 StatusIn Progress
OwnershipWCC DescriptionTowradgi Rd (Marine Pde to Moray Rd) Towradgi Rd Towradgi (1371) ActionGraffiti Removal Date Started15-09-2021 Date Completed Cost$0 StatusIn Progress
OwnershipWCC DescriptionThirroul Plaza Amenities/Toilets ActionGraffiti Removal Date Started14-09-2021 Date Completed15-09-2021 Cost$654.3 StatusResolved
OwnershipWCC DescriptionCrown St / Princes H (Gladstone Ave to Darling St) Crown St / Princes H (0329) ActionGraffiti Removal Date Started14-09-2021 Date Completed Cost$0 StatusIn Progress
OwnershipWCC DescriptionCorrimal SLSC ActionGraffiti Removal Date Started13-09-2021 Date Completed14-09-2021 Cost$541.18 StatusResolved
OwnershipWCC DescriptionFlagstaff Hill Lions Park Lighthouse and Surrounds ActionGraffiti Removal Date Started13-09-2021 Date Completed Cost$0 StatusIn Progress
OwnershipWCC DescriptionUnanderra Exeloo - Central Road ActionGraffiti Removal Date Started13-09-2021 Date Completed Cost$0 StatusIn Progress
OwnershipWCC DescriptionOffroad Footpath - Guest Park S1 ActionGraffiti Removal Date Started10-09-2021 Date Completed10-09-2021 Cost$170.14 StatusResolved
OwnershipWCC DescriptionContinental Pool ActionGraffiti Removal Date Started10-09-2021 Date Completed Cost$963.95 StatusIn Progress
OwnershipWCC DescriptionNorth Wollongong Beach Bathers Pavilion HERITAGE ActionGraffiti Removal Date Started06-09-2021 Date Completed07-09-2021 Cost$335.29 StatusResolved
OwnershipWCC DescriptionIllawarra Surf Life Saving Association Headquarters & Illawarra Potters ActionGraffiti Removal Date Started06-09-2021 Date Completed07-09-2021 Cost$0 StatusResolved
OwnershipWCC DescriptionPark Playground - Tingara Park, Thirroul Beach Reserve ActionGraffiti Removal Date Started02-09-2021 Date Completed02-09-2021 Cost$0 StatusResolved
OwnershipWCC DescriptionRight Footpath - Smith St Wollongong (Kembla St Wollongong to Church St Wollongong) Smith St Wollongong (1247) ActionGraffiti Removal Date Started02-09-2021 Date Completed07-09-2021 Cost$502.93 StatusResolved
OwnershipWCC DescriptionLeft Footpath - Keira St Wollongong (Campbell St Wollongo to Smith St Wollongong) Keira St Wollongong (0732) ActionGraffiti Removal Date Started02-09-2021 Date Completed03-09-2021 Cost$461.02 StatusResolved
OwnershipWCC DescriptionBus Shelter 3094 DOUBLE Cleveland Rd (North Side School Drop Off) ActionGraffiti Removal Date Started01-09-2021 Date Completed02-09-2021 Cost$162.71 StatusResolved
OwnershipWCC DescriptionSkatepark - REX JACKSON S1 ActionGraffiti Removal Date Started01-09-2021 Date Completed07-09-2021 Cost$680.56 StatusResolved
OwnershipWCC DescriptionGuest Park Sports ActionGraffiti Removal Date Started31-08-2021 Date Completed07-09-2021 Cost$2577.84 StatusResolved
OwnershipWCC DescriptionPark Furniture - Thirroul Beach ActionGraffiti Removal Date Started30-08-2021 Date Completed03-09-2021 Cost$420.36 StatusResolved
OwnershipWCC DescriptionCorrimal SLSC ActionGraffiti Removal Date Started30-08-2021 Date Completed01-09-2021 Cost$419.26 StatusResolved
OwnershipWCC DescriptionLot 302 DP 1084476 ActionGraffiti Removal Date Started30-08-2021 Date Completed02-09-2021 Cost$0 StatusResolved
OwnershipWCC DescriptionSt James Park Dressing Sheds/Toilets ActionGraffiti Removal Date Started30-08-2021 Date Completed07-09-2021 Cost$785.56 StatusResolved
OwnershipWCC DescriptionBellambi Point - Boat Ramp Toilets (old Coastguard Building) ActionGraffiti Removal Date Started30-08-2021 Date Completed06-09-2021 Cost$569.85 StatusResolved
OwnershipWCC DescriptionRetaining/ Sea Wall - THIRROUL BEACH / POOL Prominade, at SLSC carpark ActionGraffiti Removal Date Started25-08-2021 Date Completed01-09-2021 Cost$255.21 StatusResolved
OwnershipWCC DescriptionROAD PAVEMENT MEARES ST FERNHILL (0912) ActionGraffiti Removal Date Started23-08-2021 Date Completed02-09-2021 Cost$2128.61 StatusResolved
OwnershipWCC DescriptionRight Footpath - Kenny St (Burelli St to Ellen St Wollongong) Kenny St Wollongong (0747) ActionGraffiti Removal Date Started23-08-2021 Date Completed31-08-2021 Cost$0 StatusResolved
OwnershipWCC DescriptionBridge 0016 - Campbell St Woonona Rail Overpass ActionGraffiti Removal Date Started19-08-2021 Date Completed19-08-2021 Cost$0 StatusResolved
OwnershipWCC DescriptionBridge 0643 - Campbell St Nth Distributor Underpass ActionGraffiti Removal Date Started18-08-2021 Date Completed19-08-2021 Cost$255.21 StatusResolved
OwnershipWCC DescriptionFairy Meadow Beach Dressing Sheds/Toilets & Boatshed ActionGraffiti Removal Date Started17-08-2021 Date Completed18-08-2021 Cost$755.65 StatusResolved
OwnershipWCC DescriptionNORTHERN CW 290 / START - Veigals La Culdesack END - Under railway to Beacon Ave ActionGraffiti Removal Date Started17-08-2021 Date Completed20-08-2021 Cost$255.21 StatusResolved
OwnershipWCC DescriptionThomas Gibson Park Toilets ActionGraffiti Removal Date Started17-08-2021 Date Completed01-09-2021 Cost$659.29 StatusResolved
OwnershipWCC DescriptionThirroul Plaza Amenities/Toilets ActionGraffiti Removal Date Started16-08-2021 Date Completed17-08-2021 Cost$425.35 StatusResolved
OwnershipWCC DescriptionSkatepark - REX JACKSON S1 ActionGraffiti Removal Date Started16-08-2021 Date Completed17-08-2021 Cost$170.14 StatusResolved
OwnershipWCC DescriptionWombarra Rock Pool Amenities/Toilets ActionGraffiti Removal Date Started16-08-2021 Date Completed19-08-2021 Cost$592.67 StatusResolved
OwnershipWCC DescriptionTHOMAS DALTON PARK CP FAIRY MEADOW ActionGraffiti Removal Date Started16-08-2021 Date Completed15-08-2021 Cost$549.75 StatusResolved
OwnershipWCC DescriptionBridge 0501 - Station Rd Footbridge ActionGraffiti Removal Date Started13-08-2021 Date Completed16-08-2021 Cost$85.07 StatusResolved
OwnershipWCC DescriptionGuest Park Tennis Clubhouse & Toilets (LEASED) ActionGraffiti Removal Date Started11-08-2021 Date Completed12-08-2021 Cost$928.27 StatusResolved
OwnershipWCC DescriptionGuest Park (South) - Amenities/Kiosk ActionGraffiti Removal Date Started11-08-2021 Date Completed12-08-2021 Cost$928.27 StatusResolved
OwnershipWCC DescriptionAt the top car park, just south of the lighthouse, on the eastern side of entry way to war-time shelter. ActionGraffiti Removal Date Started11-08-2021 Date Completed12-08-2021 Cost$1113.1 StatusResolved
OwnershipWCC DescriptionGuest Park Public Toilets ActionGraffiti Removal Date Started11-08-2021 Date Completed12-08-2021 Cost$85.07 StatusResolved
OwnershipWCC DescriptionThirroul Beach Mens Toilet and Change Room HERITAGE ActionGraffiti Removal Date Started11-08-2021 Date Completed19-08-2021 Cost$432.03 StatusResolved
OwnershipWCC DescriptionGuest Park Rugby League Kiosk/Dressing Rooms/Toilets ActionGraffiti Removal Date Started11-08-2021 Date Completed12-08-2021 Cost$625.16 StatusResolved
OwnershipWCC DescriptionNORTHERN CW 180 / START - Lake Pde END - Towradgi Rd ActionGraffiti Removal Date Started10-08-2021 Date Completed11-08-2021 Cost$461.02 StatusResolved
OwnershipWCC DescriptionPinecourt Park Tennis Amenities (LEASED) ActionGraffiti Removal Date Started10-08-2021 Date Completed13-08-2021 Cost$0 StatusResolved
OwnershipWCC DescriptionJP Galvin/Stuart Park Toilet Block (with Disabled facilities) ActionGraffiti Removal Date Started10-08-2021 Date Completed Cost$502.93 StatusIn Progress
OwnershipWCC DescriptionSkatepark - REX JACKSON S1 ActionGraffiti Removal Date Started09-08-2021 Date Completed11-08-2021 Cost$1508.71 StatusResolved
OwnershipWCC DescriptionLifeguard Tower Towradgi Beach ActionGraffiti Removal Date Started09-08-2021 Date Completed13-08-2021 Cost$404.08 StatusResolved
OwnershipWCC DescriptionSandon Point SLSC ActionGraffiti Removal Date Started06-08-2021 Date Completed06-08-2021 Cost$637.93 StatusResolved
OwnershipWCC DescriptionLeft Footpath - Corrimal St Wollongo (Market St to Smith St Wollongong) Corrimal St Wollongong (0306) ActionGraffiti Removal Date Started05-08-2021 Date Completed09-08-2021 Cost$0 StatusResolved
OwnershipWCC DescriptionBus Shelter Innovation Campus Squires Way East Side;;;;Louvre-Style ActionGraffiti Removal Date Started04-08-2021 Date Completed06-08-2021 Cost$325.42 StatusResolved
OwnershipWCC DescriptionRight Footpath - Burke Way (Karmal St to Yawang St) Burke Way Berkeley (0196) ActionGraffiti Removal Date Started03-08-2021 Date Completed16-08-2021 Cost$1486.23 StatusResolved
OwnershipWCC DescriptionHutton Avenue Reserve ActionGraffiti Removal Date Started02-08-2021 Date Completed03-08-2021 Cost$144.5 StatusResolved
OwnershipWCC DescriptionBus Shelter 2363 Foothills Rd (west side 50m south of caldwell ave) ActionGraffiti Removal Date Started02-08-2021 Date Completed10-08-2021 Cost$162.71 StatusResolved
OwnershipWCC DescriptionPark Playground - Nicholson Park, Woonona Beach Reserve ActionGraffiti Removal Date Started02-08-2021 Date Completed03-08-2021 Cost$583.01 StatusResolved
OwnershipWCC DescriptionPoulter St (Robsons Rd to Hurt St) Poulter St West Wollongong (1089) ActionGraffiti Removal Date Started02-08-2021 Date Completed10-08-2021 Cost$170.14 StatusResolved
OwnershipWCC DescriptionLifeguard Tower Towradgi Beach ActionGraffiti Removal Date Started02-08-2021 Date Completed03-08-2021 Cost$801.72 StatusResolved
OwnershipWCC DescriptionWinnima Way Berkeley (Parkway) - Toilets ActionGraffiti Removal Date Started29-07-2021 Date Completed29-07-2021 Cost$83.81 StatusResolved
OwnershipWCC DescriptionKellys Falls ActionGraffiti Removal Date Started28-07-2021 Date Completed30-07-2021 Cost$420.36 StatusResolved
OwnershipWCC DescriptionBus Shelter 2363 Foothills Rd (west side 50m south of caldwell ave) ActionGraffiti Removal Date Started28-07-2021 Date Completed11-08-2021 Cost$461.02 StatusResolved
OwnershipWCC DescriptionLAKE PARADE - ACCESS ROAD - CORRIMAL ActionGraffiti Removal Date Started28-07-2021 Date Completed20-08-2021 Cost$255.21 StatusResolved
OwnershipWCC DescriptionBerkeley Rd Gwynnevi (Gipps Rd Keiraville to Acacia Ave) Berkeley Rd Gwynneville (0123) ActionGraffiti Removal Date Started28-07-2021 Date Completed11-08-2021 Cost$838.22 StatusResolved
OwnershipWCC DescriptionKanahooka Park ActionGraffiti Removal Date Started28-07-2021 Date Completed29-07-2021 Cost$584.3 StatusResolved
OwnershipWCC DescriptionCringila Community Park Toilet ActionGraffiti Removal Date Started27-07-2021 Date Completed29-07-2021 Cost$251.44 StatusResolved
OwnershipWCC DescriptionSTATION ST LINK CW01 / START - (Tennis Courts to Brickworks Ave) ActionGraffiti Removal Date Started26-07-2021 Date Completed16-08-2021 Cost$0 StatusResolved
OwnershipWCC DescriptionStation Street Thirroul Toilet ActionGraffiti Removal Date Started26-07-2021 Date Completed06-08-2021 Cost$569.23 StatusResolved
OwnershipWCC DescriptionSkatepark - REX JACKSON S1 ActionGraffiti Removal Date Started26-07-2021 Date Completed29-07-2021 Cost$963.95 StatusResolved
OwnershipWCC DescriptionGladstone Ave (Lane 93 to Union St Coniston) Gladstone Ave Wollongong (0516) ActionGraffiti Removal Date Started26-07-2021 Date Completed27-07-2021 Cost$786.7 StatusResolved
OwnershipWCC DescriptionKanahooka Park ActionGraffiti Removal Date Started26-07-2021 Date Completed09-08-2021 Cost$481.93 StatusResolved
OwnershipWCC DescriptionThomas Gibson Park Clubhouse & Canteen ActionGraffiti Removal Date Started26-07-2021 Date Completed06-08-2021 Cost$883.87 StatusResolved
OwnershipWCC DescriptionCordeaux Rd (Princes Hwy 1095 to Wade St) Cordeaux Rd Figtree (0298) ActionGraffiti Removal Date Started23-07-2021 Date Completed28-07-2021 Cost$330.34 StatusResolved
OwnershipWCC DescriptionBridge 0644 - Park Rd Nth Distributor Overpass ActionGraffiti Removal Date Started22-07-2021 Date Completed13-08-2021 Cost$673.07 StatusResolved
OwnershipWCC DescriptionBus Shelter 3062 DOUBLE Mercury St Western side ActionGraffiti Removal Date Started20-07-2021 Date Completed10-08-2021 Cost$81.35 StatusResolved
OwnershipWCC DescriptionNORTHERN CW 262 / START - Nth Beach SLSC carpark - Cutting ActionGraffiti Removal Date Started19-07-2021 Date Completed20-07-2021 Cost$417.01 StatusResolved
OwnershipWCC DescriptionBellambi Point - Boat Ramp Toilets (old Coastguard Building) ActionGraffiti Removal Date Started19-07-2021 Date Completed17-08-2021 Cost$763.13 StatusResolved
OwnershipWCC DescriptionHEASLIP ST CONISTON ActionGraffiti Removal Date Started19-07-2021 Date Completed20-07-2021 Cost$0 StatusResolved
OwnershipWCC DescriptionTowradgi Rd (Carters Lane to Carr St) Towradgi Rd Towradgi (1371) ActionGraffiti Removal Date Started16-07-2021 Date Completed16-07-2021 Cost$159.52 StatusResolved
OwnershipWCC DescriptionPinecourt Park Tennis Amenities (LEASED) ActionGraffiti Removal Date Started14-07-2021 Date Completed16-07-2021 Cost$83.4 StatusResolved
OwnershipWCC DescriptionBus Shelter 2299 Princes Hwy 1095 (Cordeaux Rd to First Ave Unanderra) ActionGraffiti Removal Date Started14-07-2021 Date Completed15-07-2021 Cost$159.52 StatusResolved
OwnershipWCC DescriptionKanahooka Point-Toilet/Gardeners Shed ActionGraffiti Removal Date Started14-07-2021 Date Completed09-08-2021 Cost$586.69 StatusResolved
OwnershipWCC DescriptionSandon Point SLSC ActionGraffiti Removal Date Started13-07-2021 Date Completed09-08-2021 Cost$1262.72 StatusResolved
OwnershipWCC DescriptionIllawarra Surf Life Saving Association Headquarters & Illawarra Potters ActionGraffiti Removal Date Started13-07-2021 Date Completed13-07-2021 Cost$333.61 StatusResolved
OwnershipWCC Description93 Crown Street OS&I Division (Partly LEASED) ActionGraffiti Removal Date Started13-07-2021 Date Completed13-07-2021 Cost$0 StatusResolved
OwnershipWCC DescriptionStrachan Park Toilets ActionGraffiti Removal Date Started13-07-2021 Date Completed15-07-2021 Cost$417.01 StatusResolved
OwnershipWCC DescriptionAustinmer Boat Harbour Toilets ActionGraffiti Removal Date Started12-07-2021 Date Completed16-08-2021 Cost$1343.63 StatusResolved
OwnershipWCC DescriptionTucker Avenue Bushland ActionGraffiti Removal Date Started12-07-2021 Date Completed30-07-2021 Cost$166.8 StatusResolved
OwnershipWCC DescriptionLeft Footpath - Brickworks Ave (East side of Bridge to Clyde Cl) Brickworks Ave Thirroul ActionGraffiti Removal Date Started09-07-2021 Date Completed16-08-2021 Cost$504.58 StatusResolved
OwnershipWCC DescriptionHarry Graham Park Dressing Sheds/Toilets (LEASED) ActionGraffiti Removal Date Started09-07-2021 Date Completed12-07-2021 Cost$1304.23 StatusResolved
OwnershipWCC DescriptionBus Shelter 2023 Princes Hwy 1094 (Gibsons Rd to Arkell Dr) ActionGraffiti Removal Date Started09-07-2021 Date Completed15-07-2021 Cost$229.36 StatusResolved
OwnershipWCC DescriptionBalgownie War Memorial Park - Memorial ActionGraffiti Removal Date Started08-07-2021 Date Completed14-07-2021 Cost$667.22 StatusResolved
OwnershipWCC DescriptionPark Landscaping - Thomas Gibson Park Sports 1 ActionGraffiti Removal Date Started08-07-2021 Date Completed09-07-2021 Cost$166.8 StatusResolved
OwnershipWCC DescriptionFoley St (Porter St to Hillview Ave) Foley St Gwynneville (0460) ActionGraffiti Removal Date Started08-07-2021 Date Completed20-07-2021 Cost$504.56 StatusResolved
OwnershipWCC DescriptionCharcoal Park ActionGraffiti Removal Date Started05-07-2021 Date Completed12-07-2021 Cost$831.57 StatusResolved
OwnershipWCC DescriptionSTATION ST THIRROUL ActionGraffiti Removal Date Started05-07-2021 Date Completed08-07-2021 Cost$449.81 StatusResolved
OwnershipWCC DescriptionNorth Wollongong Beach Bathers Pavilion HERITAGE ActionGraffiti Removal Date Started02-07-2021 Date Completed02-07-2021 Cost$145.95 StatusResolved
OwnershipWCC DescriptionPark Playground - James Pearson Park ActionGraffiti Removal Date Started02-07-2021 Date Completed05-07-2021 Cost$583.82 StatusResolved
OwnershipWCC DescriptionPark Playground - Crown St Mall Playground ActionGraffiti Removal Date Started02-07-2021 Date Completed05-07-2021 Cost$683.35 StatusResolved
OwnershipWCC DescriptionThomas Gibson Park Toilets ActionGraffiti Removal Date Started02-07-2021 Date Completed08-07-2021 Cost$1397.04 StatusResolved